Pier 62 Rebuild and Habitat Improvements pier 62 rebuild and habitat improvements PIER 62 REBUILD AND HABITAT IMPROVEMENTS To improve infrastructure and the surrounding habitat on the downtown Seattle waterfront, Anchor QEA worked with a construction management team for the City of Seattle to replace the old timber Pier 62 with a steel and concrete pier, providing a new and improved public park. Construction Management construction-management construction management CONSTRUCTION MANAGEMENT Habitat Restoration and Mitigation habitat-restoration habitat restoration and mitigation HABITAT RESTORATION AND MITIGATION Unmanned Aerial Systems (UAS)/Drones unmanned-aerial-systems-uas-drones unmanned aerial systems (uas)/drones UNMANNED AERIAL SYSTEMS (UAS)/DRONES State/Local state-local state/local STATE/LOCAL Washington washington washington WASHINGTON
Lower Russell Levee Setback lower russell levee setback LOWER RUSSELL LEVEE SETBACK As a part of King County’s Lower Russell Levee Setback project in Washington, Anchor QEA’s team was hired to provide construction management services, including field inspection; cost, quality, and document control; materials testing; and archaeological monitoring. Construction Management construction-management construction management CONSTRUCTION MANAGEMENT Unmanned Aerial Systems (UAS)/Drones unmanned-aerial-systems-uas-drones unmanned aerial systems (uas)/drones UNMANNED AERIAL SYSTEMS (UAS)/DRONES State/Local state-local state/local STATE/LOCAL Washington washington washington WASHINGTON
Construction Management and Water Quality Monitoring construction management and water quality monitoring CONSTRUCTION MANAGEMENT AND WATER QUALITY MONITORING Anchor QEA helped carry out construction management and monitoring for Honeywell at the Lake Linden Area A Time-Critical Removal Action (TCRA) in Michigan, part of a Superfund site in the Great Lakes faced with elevated concentrations of various metals. Construction Management construction-management construction management CONSTRUCTION MANAGEMENT Habitat Restoration and Mitigation habitat-restoration habitat restoration and mitigation HABITAT RESTORATION AND MITIGATION Unmanned Aerial Systems (UAS)/Drones unmanned-aerial-systems-uas-drones unmanned aerial systems (uas)/drones UNMANNED AERIAL SYSTEMS (UAS)/DRONES Industrial industrial industrial INDUSTRIAL Michigan michigan michigan MICHIGAN
Elliott Bay Seawall Replacement and Habitat Restoration elliott bay seawall replacement and habitat restoration ELLIOTT BAY SEAWALL REPLACEMENT AND HABITAT RESTORATION Anchor QEA was a part of a multidisciplinary consulting team working for the Seattle Department of Transportation on the planning, design, and construction of the 7,000-foot-long Elliott Bay Seawall Project along the downtown waterfront for seismic stability improvements. Construction Management construction-management construction management CONSTRUCTION MANAGEMENT Habitat Restoration and Mitigation habitat-restoration habitat restoration and mitigation HABITAT RESTORATION AND MITIGATION Unmanned Aerial Systems (UAS)/Drones unmanned-aerial-systems-uas-drones unmanned aerial systems (uas)/drones UNMANNED AERIAL SYSTEMS (UAS)/DRONES State/Local state-local state/local STATE/LOCAL Washington washington washington WASHINGTON